Fukushima nuclear power plant leaks 100 tons of nuclear sewage. Dongdian said or caused human error

Fukushima Nuclear Power Plant leaks 100 tons of nuclear sewage, Dongdian said or made a human error

On the evening of February 21st, the head of the Tokyo Electric Power Company explained the situation of the sewage leak from the storage tank of the Fukushima Daiichi nuclear power plant at the company headquarters in Tokyo’s Nakagawacho, and thought that it might be that the staff mistakenly connected the storage. The pipe valve of the tank opens to cause a leak.

China News Service, February 22, according to a report by Japan’s Kyodo News Agency, Tokyo Electric Power Co., Ltd. said on the 21st that the Fukushima Daiichi nuclear power plant tank leaked about 100 tons of high-activity nuclear sewage. The pipe valve is likely to be opened before the leak occurs. The valve is closed when it is confirmed on site after the leak is discovered. It may be that someone accidentally opened it and restored it for concealment.

The tank is leaking out of the tank due to the opening of the valve. At that time, TEP considered that the valve might be malfunctioning.

At the press conference on the 21st, the director of the Atomic Energy and Location Headquarters, Mr. Ogano said: “It may be a (staff) operation error. I hope to hear the situation at the time and investigate whether there is any concealment. ”

The person in charge of the Atomic Power Regulations Office, who received the report from Dongdian, said: “It is not known why the valve was opened and closed. Attention is being paid to the investigation of the staff of Dongdian. It has been requested (Dongdian) to report to us once new circumstances are discovered. ”

Responsible Editor: Zhao Yanlong

Leave a Reply

Your email address will not be published. Required fields are marked *